independent
- independent from the property owner

efficient
- time advantage compared to other methods

lean
- leaner and more simple process
Rehabilitation of the municipal section of the house connection pipe can be carried out from the main sewer or collector



| Technical data | |
|---|---|
| Possible connection pipes | 4“ (DN 100), 5“ (DN 125), 6“ (DN 150) with bends up to 90° |
| Possible rehabilitation length of the connection pipes | up to 164 ft (50 m) |
| Diameter of non-accessible sewer (round profiles) | 8“ (DN 200), 10“ (DN 250), 12“ (DN 300) |
| Required equipment |
|
| Required material |
|